A priority ranging from 1 as the highest priority to 5 as the lowest priority.
A multi-line text note.
A status consisting of:
Not started
In Progress
Completed
Waiting
Deferred
A percentage completed. Not applicable if task status is Not Started or Completed.
The date the task is due for completion. This is optional.
The date the task was started. Not applicable if the task status is Not Started.
The date the task was completed. Only applicable if the task status is Completed.
One or more categories. If the task is not assigned any category it is marked as unfiled.
Application views
It is possible to view tasks in the following three ways:
As a sorted list of tasks.
A detailed view of a single task.
A task opened for editing.
Sorted list
The primary display of the application shows a sorted list of tasks. In this
list a user is able to change the priority of a task, mark a task Completed
or view additional details of the task.
The sorting order of the tasks is:
Completed: incomplete tasks are shown first.
Priority: tasks with a priority closer to 1 are shown first.
Description: tasks are shown in alphabetic order.
From the sorted list view the user is able to:
Create a new task through the Edit View of the task.
View the details for the task through the Detailed View of the task.
Mark tasks as completed.
Change the priority of a task
Filter the list of tasks shown according to a specified category.
Detailed view
The detailed view of a task shows data for a single task. This is shown as
rich text. All the information for the task is formatted for optimum readability.
From the sorted list view the user is able to:
Edit the current task through the Edit View of the task.
Delete the current task.
Beam the current task using IR.
Edit view
The edit view of a task allows the user to specify the data for a new task
or modify that of an old task.
Non-applicable values are disabled. For example, the start date field is disabled if the the task status is marked as Not Started.
When the editing has been completed the user is able to either accept or cancel the changes they have made.
Features
Add task
It is possible to add tasks. The application does not add a task without a description.
Delete task
It is possible to delete tasks. The application prompts the user to confirm the deletion of a task.
Edit task
It is possible to modify tasks. This includes changing the status and adding notes.
Beaming
It is possible to beam a single task to or from another device using IR.
Priorities
It is possible to prioritize tasks using the scale of 1 as the highest and 5 as the lowest.
Categories
It is possible to categorize tasks.
Filtering
It is possible to filter the view of tasks by category.
Maximum number of tasks
The maximum number of tasks is determined by the available device memory. Once this limit is reached it is only possible to delete tasks; they cannot be edited nor can any new tasks be added.
Storage
Each event requires approximately 100 bytes of storage plus UTF-8 string
storage for the description, plus approximately 16 bytes per category membership, plus approximately 50 bytes if a due date is specified.
Memory
While running, each event requires approximately 300 bytes of storage,
plus UTF-16 string storage for the description, plus approximately 80 bytes per category membership.
QDL support
It is possible to access tasks from other applications via the QDL service interface.
When activated the Tasks application runs and shows linked tasks.
QDL links are embedded into the notes of a task. When in the Detailed View,
clicking on a QDL link activates the link's application.
Config
The Phone Edition's Task application does not store any configuration-related data.
Services
IR Receive text/x-vCalendar-Tasks
Tasks - allows editing of tasks via PIM Library interface.